|
Construct a sanitary sewer system to replace all the individual septic tanks. Remove the discharge of wastewater to the lake and surrounding ground water that fed the lake.
Work with the City of Ruthven to provide wastewater treatment as the economy of Ruthven depended on a viable Lost Island Lake community. Develop equitable assessment procedures to spread the cost of both the collection and treatment systems to the Lost Island. |