|
Design an 8” water main to connect to the existing Storm Lake water system in Emerald Park and run it all the way around the lake to Bel-Air Subdivision.
Work with individual property owners to obtain easements and get commitments for connecting to the new water main. Develop equitable assessment procedures to spread the cost to those property owners that committed to the cost of the system. Set up other rates for those who might connect later. |