The adaptation/modification of a standard design allowed the contractor to use readily available standard beams. The substructure—piers and abutments—were also modifications of standard plan details allowing forming with commonly used materials. Once constructed, the bridge was used to move material from a cut section of the south side of the bridge to the approach fill on the north side of the waterway. The previous high truss has been retained as a historical structure and a canoe access with a parking area was constructed along the south bank of Mill Creek.
|